Reactive power and power factor: why it shows up on the bill and how to compensate it correctly in Moldova and Romania

Reactive energy does no useful work, but it loads the grid: it raises current, losses and voltage drops. That is why operators charge for it when the power factor falls below a limit. We show how the charge is calculated in Romania and in the Republic of Moldova, how compensation is sized and why a capacitor bank installed without measurements can do more harm than good.

Author: ESCO VOLTAJ engineering team Updated:

Key points

  • Romania: you pay for reactive energy above the value corresponding to a power factor of 0.9, both inductive and capacitive; below 0.65 the price triples.
  • Moldova: non-household consumers are billed additional technological consumption if cos φ < 0.92 at 0.4 kV or < 0.87 at 10(6) kV.
  • Compensation power is simple to calculate: QC = P × (tan φ₁ − tan φ₂) — but on measured data, not nameplate values.
  • With variable-frequency drives and other non-linear loads, plain capacitors can go into resonance; detuned steps with blocking reactors (7%, 189 Hz) or active filters are used instead.
  • After solar panels are installed, the power factor measured at the grid connection falls, even though the motors are the same.

What reactive energy is

Induction motors, transformers, chokes and ballasts need a magnetic field in order to work. The energy of this field flows back and forth between the grid and the equipment 100 times a second without being converted into mechanical work or useful heat — this is reactive energy (kvarh). The power that does useful work is active power P (kW); the power that actually loads cables and transformers is apparent power S (kVA):

S² = P² + Q² · cos φ = P / S · tan φ = Q / Pφ — the phase angle between voltage and current; cos φ — the power factor for a sinusoidal load.
φ₁ φ₂ P = 400 kW S₁ = 533 kVA S₂ = 421 kVA Q₁ = 353 kvar Q₂ = 132 kvar QC = 221 kvar cos φ: 0.75 → 0.95 Current at 0.4 kV: 770 A → 608 A (−21%) Joule losses in cables and the transformer: −38% Capacity freed in the transformer: about 112 kVA
The power triangle for a 400 kW consumer, before (red) and after compensation (green). Active power stays the same; reactive power, apparent power and current fall.

The lower cos φ is, the higher the current for the same useful power. Losses in cables and in the transformer grow with the square of the current, and the voltage drop grows in proportion to it. In the example above, raising the power factor from 0.75 to 0.95 cuts the current by 21% and the Joule losses by 38% — with no change in production.

The opposite, capacitive regime appears with overcompensation, with long medium-voltage cables running unloaded or with many electronic power supplies, and in Romania it is charged in the same way as the inductive regime.

How reactive energy is billed in Romania

The rules are set by the Methodology approved by ANRE Order No. 33/2014, as amended by ANRE Order No. 76/2016:

  • the limit power factor is 0.9, for both the inductive and the capacitive regime (Art. 9);
  • only the reactive energy above the value corresponding to this limit is paid for, calculated separately for each settlement interval and delimitation point;
  • if the average power factor is between 0.65 and 0.9, the regulated price applies; below 0.65 — three times the regulated price (Art. 11);
  • the regulated price is approved by ANRE for each distribution operator's concession area;
  • household customers with approved power of up to 30 kW do not pay for reactive energy (Art. 8).
Ereactive billed = Ereactive measured − Eactive measured × tan(arccos 0.9) = Ereactive measured − 0.484 × Eactive measured

Example: in one month a factory draws 200 MWh of active energy and 176 Mvarh of inductive reactive energy from the grid — the power factor is 0.75. The free allowance is 200 × 0.484 = 96.9 Mvarh; 79.1 Mvarh is billed at the regulated price. If the power factor fell to 0.6, 169.8 Mvarh would be billed, and at triple the price.

How it is billed in the Republic of Moldova

In Moldova, a low power factor is billed not in kvarh but as additional active energy — the technological consumption (losses) in the network caused by reactive energy flow. The Regulation on electricity supply (ANRE Decision No. 169/2019) provides that:

  • the technological consumption caused by the power factor of a non-household consumer's installations is calculated according to the Instruction approved by ANRE Decision No. 89/2003 (point 83);
  • it is billed only if cos φ, calculated at the delimitation point, is below 0.92 for installations connected at 0.4 kV and below 0.87 at 10(6) kV (the mandatory clauses of the supply contract, points 3.5 and 10.5);
  • the regime for capacitive reactive energy and for compensation equipment — its power and the hours when overcompensation is allowed or forbidden — is set by the system operator in the annex to the contract;
  • if the meter is not installed at the delimitation point, the losses in the consumer's transformers and lines are added (ANRE Decision No. 246/2007).

What this means in practice: for a consumer connected at 0.4 kV, the target is a cos φ of at least 0.92 in every billing period, and the automatic controller has to be programmed so that it does not go capacitive during the hours forbidden by the contract.

How large the compensation should be

QC = P × (tan φ₁ − tan φ₂)P — representative active power (kW), φ₁ — present situation, φ₂ — target.
cos φ0.600.700.750.800.850.900.920.950.98
tan φ1.3331.0200.8820.7500.6200.4840.4260.3290.203

For 400 kW and a rise from 0.75 to 0.95: QC = 400 × (0.882 − 0.329) ≈ 221 kvar. The target is usually set slightly above the limit on the bill — 0.95 instead of 0.9 or 0.92 — because the load varies over time.

Which type of compensation

  • Fixed, at the motor or at the transformer — for constant loads. On motors, the capacitor rating must not exceed the motor's no-load reactive power, so that the motor does not self-excite when it is disconnected.
  • Automatic, in steps, at the main switchboard — the controller switches steps in and out according to the load. This is the usual solution for industrial sites.
  • Detuned, with blocking reactors — when there are harmonics in the network.
  • Active filters or static var generators (SVG) — for loads that change very quickly (welding, cranes, furnaces) or with high harmonics; they regulate continuously, without steps.
An automatic power factor correction bank with detuned steps: capacitors, blocking reactors, contactors and a power factor controller.
An automatic power factor correction bank with detuned steps: capacitors, blocking reactors, contactors and a power factor controller. illustrative image

Harmonics and the danger of resonance

Variable-frequency drives, rectifiers, UPS units and LED drivers draw non-sinusoidal currents, with 5th, 7th, 11th and 13th harmonics (250, 350, 550, 650 Hz). A capacitor's impedance is inversely proportional to frequency, so it “attracts” these currents. Together with the transformer's inductance it forms a circuit that resonates at a frequency close to:

fr ≈ f₁ × √(Ssc / QC)f₁ = 50 Hz, Ssc — short-circuit power at the low-voltage busbars, QC — the connected capacitor bank's power.

Example: a 1,000 kVA transformer with uk = 6% gives a short-circuit power of about 16.7 MVA at the 0.4 kV busbars. With a 400 kvar capacitor bank, fr ≈ 50 × √(16,700 / 400) ≈ 323 Hz — between the 5th and the 7th harmonic, exactly where drives produce the most. The result: high currents through the capacitors, overheating, blown fuses and voltage distortion.

The classic solution is a reactor in series with each step. With a 7% detuning factor, the tuning frequency is 50 / √0.07 ≈ 189 Hz: above it the step behaves inductively and can no longer resonate with the 5th, 7th and higher harmonics. When harmonics also have to be reduced, not just avoided, active filters are used.

Voltage quality limits are set by the EN 50160 standard (for example, total harmonic distortion of the voltage of at most 8% in low- and medium-voltage networks), and measurement is done with class A analysers according to IEC 61000-4-30.

Why reactive energy rises after solar panels are installed

A solar PV system for self-consumption reduces the active energy drawn from the grid, but the motors still need the same reactive energy, and inverters usually run at a power factor close to 1. At the connection point, the ratio of reactive to active energy rises.

Example: before the panels, a factory draws 200 MWh and 96 Mvarh from the grid — a power factor of 0.90, right at the limit, nothing to pay in Romania. After the panels cover 80 MWh, 120 MWh comes from the grid along with the same 96 Mvarh: the power factor falls to 0.78, and 37.9 Mvarh of reactive energy appears on the bill.

The solutions: resizing and reprogramming the compensation, using the inverters' ability to produce reactive power (if the connection permit allows it) or a static var generator. That is why, in our solar PV projects for businesses, checking the power factor is part of the study.

The steps of a compensation project

  1. A class A measurement at the main switchboard, usually for a week: powers, power factor, current and voltage harmonics, unbalance, events.
  2. Analysis of the bills for at least 12 months and of the contract rules.
  3. Sizing: total power, the number and size of steps, the type (standard, detuned, active), the installation point.
  4. Installation and commissioning, with the controller settings and the capacitor discharge times adjusted.
  5. A verification measurement after installation and maintenance: capacitors gradually lose capacitance, contactors wear out, and thermography reveals overheated connections early.

We carry out power quality measurements with a class A analyser, size compensation and harmonic filtering and provide maintenance and thermography for the installations.

Frequently asked questions

How can I tell whether I am paying for reactive energy?

In Romania, the bill has a separate line for reactive energy (kvarh) — inductive or capacitive — at the regulated price. In Moldova, it appears as additional technological consumption calculated from the power factor. Hourly or 15-minute meter data show exactly when the power factor drops.

What power factor do I need?

In Romania, at least 0.9 in both the inductive and the capacitive regime; in Moldova, at least 0.92 for installations connected at 0.4 kV and 0.87 at 10(6) kV. In practice, compensation is set slightly above these limits, for example at 0.95.

Is capacitive reactive energy charged too?

In Romania, yes: the 0.9 limit also applies to the capacitive regime. In Moldova, the capacitive regime and the hours when overcompensation is forbidden are set in the annex to the supply contract. A badly set controller or steps left connected at night can lead to such charges.

Why did the capacitors in the compensation bank burn out?

The most common causes are harmonics and resonance with the transformer, high voltage, the temperature inside the cabinet and ageing. A harmonics measurement shows whether detuned steps with blocking reactors or active filters are needed.

Can installing solar panels increase reactive energy charges?

Yes. The panels reduce the active energy drawn from the grid while the reactive energy demand stays the same, so the power factor measured at the connection point falls. The compensation has to be recalculated after the system is installed.

Sources and references

  1. ANRE Romania — Methodology for setting payment obligations for reactive electricity (Order No. 33/2014, consolidated) — in Romanian
  2. Despre-energie.ro — ANRE Order No. 76/2016 on payment for reactive energy — in Romanian
  3. ANRE Moldova — Regulation on electricity supply, Decision No. 169/2019 — in Romanian
  4. Legis.md — ANRE Decision No. 89/2003, Instruction on calculating technological electricity consumption — in Romanian
  5. Premier Energy — Instruction on calculating technological electricity consumption in distribution networks — in Romanian

Prepared by the engineers of ESCO-VOLTAJ S.R.L. — an energy service company from Chișinău, active since 2007, with ISO 9001, 14001 and 45001 management systems and its own class A measurement laboratory.

General information, valid on the date of the last update. Regulations and prices change: check the text in force or ask us to assess your case.

Contact

Call us. An engineer answers.

Or write a few lines about your site — we will reply with a specific answer.

Prefer to talk?

+373 79 77 81 55

Who we reply toemail and company are optional

Required field
Required field
Please check the email address

What you needoptional, in your own words

Your enquiry is read by one of our engineers, not by an automated system. Your data is used only to reply to you.

Thank you! Your enquiry has been sent.

We will get back to you with a specific answer. For urgent matters, please call us directly.

Call now Write to us