Turnkey EPC construction
Design, equipment, construction. One contract.
Turnkey delivery of solar parks, power networks and transformer substations: design, equipment supply, construction and commissioning.

What it includes
What we build
- Ground-mounted solar parks, turnkey
- 0.4–400 kV overhead and underground power lines
- Pole-mounted and ground transformer substations
- Public lighting lines
- Service connections: linking consumers to the network
- Indoor electrical networks: installation, repair and maintenance
- Low-current systems: fire detection and alarm, automation, fibre optics, structured cabling, access control
What you get
Why turnkey
One party responsible
Design, equipment and construction are the responsibility of the same contractor.
Results on the ground
The solar parks in Zgărdești and Brăviceni were commissioned in 2026.
Maintenance after handover
Maintenance and repair services under warranty and after it.
Frequently asked questions
Short answers
What does “turnkey” include?
Design, supply of equipment, construction, grid connection and commissioning of the facility.
Do you only build solar parks?
No. We also build outdoor and indoor power networks, transformer substations, public lighting, connections and low-current systems.
Contact
Call us. An engineer answers.
Or write a few lines about your site — we will reply with a specific answer.
Prefer to talk?
+373 79 77 81 55- Emailoffice@escovoltaj.md
- Officestr. Bună Vestire 15/1, Chișinău, Republic of Moldova


