Projects
Commissioned solar parks, wind-power works, supervision of the largest investment in the transmission grid, and storage and cogeneration projects in development.

Zgărdești solar park
Installed capacity1.3 MW
StatusEligible producer
Commissioned2026

Brăviceni solar park
Installed capacity1.2 MW
StatusEligible producer
Commissioned2026

400 kV Vulcănești–Chișinău line
Length157 km
Voltage400 kV
Capacity630 MVA

Wind power projects
FieldWind energy
RoleConsulting and construction
RegionRepublic of Moldova

Batteries at 5 eligible producers
Projects5
Capacity≈ 5 MWh each
Connectionexisting substation

CET-Nord Bălți: cogeneration and BESS
Storage (BESS)70 MW / 140 MWh
Cogeneration25 MW
Commissioningplanned 2028
The photos of projects in operation are real, taken by drone on site. Consulting projects and projects in development are illustrated with generated images marked “illustrative image”.
Contact
Call us. An engineer answers.
Or write a few lines about your site — we will reply with a specific answer.
Prefer to talk?
+373 79 77 81 55- Emailoffice@escovoltaj.md
- Officestr. Bună Vestire 15/1, Chișinău, Republic of Moldova