In operation · 2026
Brăviceni solar park, 1.2 MW
A ground-mounted solar park with eligible producer status, built for Lit Oceans and commissioned in 2026.
- Client
- Lit Oceans
- Location
- Brăviceni, Orhei district
- Capacity
- 1.2 MW DC · 890 kW AC
- Status
- Eligible producer
- Commissioned
- 2026
1.2 MW on the edge of Brăviceni village
The Brăviceni solar park has an installed capacity of 1.2 MW DC and 890 kW AC and operates with eligible producer status.
The footage and photos were taken by drone in August 2025, on the completed park. The park was commissioned in 2026.
The park from the air



Services
Services involved in this project

Turnkey EPC construction
Design, equipment supply and construction: solar parks, power networks, transformer substations.

Renewable energy consulting
Solar, wind and biogas plants: land, equipment, grid connection approval, permits, design, construction.

Electrical and thermal design
LED lighting, LV/MV power networks, thermal installations and waste-heat recovery.
Contact
Call us. An engineer answers.
Or write a few lines about your site — we will reply with a specific answer.
Prefer to talk?
+373 79 77 81 55- Emailoffice@escovoltaj.md
- Officestr. Bună Vestire 15/1, Chișinău, Republic of Moldova