+373 79 77 81 55
Hall with a gas-engine cogeneration unit (illustrative image)

In development · 2028 Illustrative image

Gas cogeneration and battery storage at CET-Nord

A project in development in partnership with CET-Nord: a 70 MW / 140 MWh battery storage system and 25 MW of gas-engine cogeneration, with commissioning planned for 2028.

Partner
CET-Nord, Bălți
Storage
70 MW / 140 MWh
Cogeneration
25 MW, gas engines
Connection
110 kV, existing substation
Commissioning
planned for 2028

Stability for the grid, heat for the city

The project brings together, on the CET-Nord site, a battery energy storage system of 70 MW / 140 MWh and a 25 MW cogeneration plant with gas-fired internal combustion engines, connected at 110 kV in the existing CET-Nord substation.

A strategic project. It is included in the list of strategic investment projects and is critical for energy security.

A prepared site. The 110 kV connection, the gas pipeline from the transmission network, the environmental approval and the technical concept are in place.

What it brings to the system. Stability for the transmission grid and heat for district heating in Bălți.

How it works

Battery, cogeneration and grid in one 110 kV node

The battery and the gas engines connect to the same 110 kV substation at CET-Nord. Pick a mode to see which way the energy flows.

Natural gaspipeline from the transmission network
Cogeneration · 25 MWgas-fired internal combustion engines
Bălți district heatingheat in the cold season
CET‑Nord substation · 110 kVexisting connection
BESS · 70 MW / 140 MWhbattery storage
Transmission gridthe national power system
  • gas
  • electricity
  • heat
  • storage

The battery charges from the grid

At night, between 00:00 and 06:00, the battery charges from the grid through the 110 kV substation, at up to 70 MW.

The battery delivers to the grid

In the evening, between 17:00 and 21:00, the stored energy goes back to the grid. 140 MWh means two hours of operation at the full 70 MW.

A response within seconds

The battery gives or absorbs power within seconds, in either direction, when the grid is out of balance, and helps to hold the voltage.

Power and heat from the same unit

The gas engines generate electricity for the grid, and the heat recovered from them goes to district heating in Bălți.

A simplified diagram of a project in development; the parameters may change before commissioning.

What the project can deliver

01

Energy moved from the night to the evening peak

The battery charges at night, between 00:00 and 06:00, and delivers in the evening, between 17:00 and 21:00.

energy stored in one cycle (70 MW × 2 hours)
140 MWh
delivered per day with one cycle; ~263 MWh with two
~131 MWh
delivered per year, at 1–2 cycles a day
48–96 GWh

02

Balancing

It gives or absorbs power within seconds when the grid is out of balance, and holds the voltage.

regulation up and down, sustained for 2 hours (140 MWh)
±70 MW
of hours: 70 MW when discharging; 89 % when charging (N-1)
99.9 %
voltage regulation at 70 MW (estimated)
±32 Mvar

03

Heat

The gas engines produce electricity and heat; the heat goes to district heating in Bălți.

electrical output, gas engines
25 MW
recovered thermal output, ≈ 1 MWt per 1 MWe (estimated)
22–25 MWt
heat over the cold season (November–March), estimated ceiling
80–90 GWh

N-1 means the grid holds even with one 110 kV line out of service. Source: ESCO-VOLTAJ analysis of Moldelectrica hourly data, 2025.

What ESCO-VOLTAJ does at CET-Nord

  1. 01

    Takes over the connection approval

    Becomes the holder of the capacities of 70 MW of storage and 25 MW of generation.

  2. 02

    Designs

    The installation and the concrete platforms, at its own expense.

  3. 03

    Finances and builds

    The cogeneration plant and the BESS system, owned by ESCO-VOLTAJ.

  4. 04

    Operates and maintains

    Delivers energy to the grid and heat to CET-Nord in the cold season.

  5. 05

    Decommissions at the end

    Clears the site at the end of the partnership.

CET-Nord brings

The site, the 110 kV connection, the gas pipeline, the utilities, the existing approvals and the technical concept.

CET-Nord gains

It makes use of the connection approval without investing itself, with income from access and from the energy delivered, plus heat.

Illustrative images

BESS battery containers next to a solar park (illustrative image)
Illustrative image

Contact

Call us. An engineer answers.

Or write a few lines about your site — we will reply with a specific answer.

Prefer to talk?

+373 79 77 81 55

Who we reply toemail and company are optional

Required field
Required field
Please check the email address

What you needoptional, in your own words

Your enquiry is read by one of our engineers, not by an automated system. Your data is used only to reply to you.

Thank you! Your enquiry has been sent.

We will get back to you with a specific answer. For urgent matters, please call us directly.

Call now Write to us