
In operation · 2026
Zgărdești solar park, 1.3 MW
A ground-mounted solar park with eligible producer status, built for XENIA-TRAVEL and commissioned in 2026.
- Client
- XENIA-TRAVEL
- Location
- Zgărdești, Telenești district
- Capacity
- 1.3 MW DC · 950 kW AC
- Status
- Eligible producer
- Commissioned
- 2026
From bare land to power delivered to the grid
The Zgărdești solar park has an installed capacity of 1.3 MW DC and 950 kW AC. The energy produced is delivered to the grid under eligible producer status.
The drone photos below show the progress of the site: the land before works in September 2025, the setting-out and assembly of the structures in October 2025 and the finished park in December 2025. The park was commissioned in 2026.
The site, step by step



Services
Services involved in this project

Turnkey EPC construction
Design, equipment supply and construction: solar parks, power networks, transformer substations.

Renewable energy consulting
Solar, wind and biogas plants: land, equipment, grid connection approval, permits, design, construction.

Electrical and thermal design
LED lighting, LV/MV power networks, thermal installations and waste-heat recovery.
Contact
Call us. An engineer answers.
Or write a few lines about your site — we will reply with a specific answer.
Prefer to talk?
+373 79 77 81 55- Emailoffice@escovoltaj.md
- Officestr. Bună Vestire 15/1, Chișinău, Republic of Moldova